The company profile reflects the history of health and safety together with environmental impact assessments done.
(Updated: July 2021)
The purpose of this company profile document represents the main purpose of the company.
Thombi Consultants has been operating since 2009. Since the establishment of the company, numerous projects have been undertaken representing the positions of OHS Agent
To provide a comprehensive, and professional OHS service.
To build an OHS service to government and private sector developments.
Period: May 2021 –December 2021
Appointment: OHS Agent
Client: JRA
Description: Road works and storm water upgrade
Complete: In process
Value of project: R35m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period:
Appointment: OHS Agent
Client: JRA
Description:
Complete: 100%
Value of project:
Task:
-
Period:
Appointment: OHS Agent
Client:
Description:
Complete: 100%
Value of project:
Task:
Period: January 2019 – January 2021
Appointment: OHS Agent
Client: JRA
Description: Road works and storm water upgrade
Complete: 100%
Value of project: R75m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: June 2018 – December 2018
Appointment: OHS Agent
Client: JRA
Description: Construct a pedestrian bridge
Complete: 100%
Value of project: R35m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Dec 2015 – Jul 2016
Appointment: OHS Agent
Client: JRA
Description: Road works and storm water upgrade
Complete: 100%
Value of project: MR45
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Apr 2015 – Aug 2015
Appointment: OHS Agent
Client: Kumani Projects
Description: Upgrade the stormwater infrastructure
Complete: 100%
Value of project: R35m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Aug 2016 – Feb 2017
Appointment: OHS Agent
Client: JRA
Description: Professional services for the design and construction supervision of the subsoil drainage system in Mogase View, Soweto
Complete: 100%
Value of project: R25m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
Period: Aug 2016 – Oct 2016
Appointment: OHS Agent
Client: Nyoni Projects (NP)
Description: Reconstruct and rehabilitate the stormwater channel
Complete: 100%
Value of project: R25m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Feb 2015 – Aug 2015
Appointment: OHS Agent
Client: JRA
Description: Upgrade of storm water infrastructure
Complete: 100%
Value of project: R40m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Nov 2015
Appointment: OHS Agent
Client: JRA
Description: provision of professional services for the design and construction supervision of remedial protection measures
Complete: 100%
Value of project: R25m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
Period: Apr 2015 – Jul 2015
Appointment: OHS Agent
Client: JRA
Description: Fairland River/Stormwater Re-establishment Project
Complete: 100%
Value of project: R25m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Nov 2016
Appointment: OHS Agent
Client: JRA
Description: Provision of professional services for the design and construction supervision of erosion protection along Fourways stream, at Fourways extension 16.
Complete: 100%
Value of project: R35m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
Upgrade of storm water pipes - Health and Safety inspection.
Period: Jan 2015 – May 2015
Appointment: OHS Agent
Client: JRA
Description: Rehabilitation & structural repairs of existing open channel.
Complete: 100%
Value of project: R25m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Aug 2015 – Sep 2015
Appointment: OHS Agent
Client: JRA
Description: Rehabilitation & structural repairs of existing open channel
Complete: 100%
Value of project: R35m
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: 2015 – 2017
Appointment: OHS Agent
Client: Basil Read
Description: Build a new School.
Complete: 100%
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: June 2016
Appointment: OHS Agent
Client: Johannesburg Social Housing Project
Description: Conversion & Refurbishment of Existing Building into Social Housing Units
Complete: 100%
Value of project:
Task:
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
Period: Dec 2015 – Jan 2017
Appointment: OHS Agent
Client: Uhuru Engineering Projects
Description: Renovation and upgrade of Psychiatric Department - Health and Safety inspection.
Complete: 100%
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Renovation and upgrade of School - Health and Safety inspection.
Period: May 2015 – Aug 2015
Appointment: OHS Agent
Client: SISONKE-PMSA JV
Description: Restorative repairs
Complete: 100%
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Jun 2015 – Dec 2015
Appointment: OHS Agent
Client: Nale Trading CC
Description: Renovation and upgrade of sport and recreational center - Health and Safety inspection
Complete: 100%
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Nov 2013 – Apr2014
Appointment: OHS Agent
Client: Brookhaven
Description: Upgrade of bridge and stormwater reticulation
Complete: 100%
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Nov 2013 – Apr2014
Appointment: OHS Agent
Client: Brookhaven
Description: Upgrade stormwater reticulation
Complete: 100%
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: October 2017 – June 2018
Appointment: OHS Agent
Client: Brookhaven
Description: Breaking ground and prepare new roads and service infrastructure for residential development - Health and Safety inspection.
Complete: 100%
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Jul 2018 – Nov 2018
Appointment: OHS Agent
Client: BTS
Description: Shopping mall Construction - Health and Safety inspection.
Complete: 100%
Permit: Permit prepared according to CR 3, submitted for approval and approved.
Value of project:
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Jan 2014 – January 2018
Client: ABACUS
Permit: Permit prepared according to CR 3, submitted for approval and approved.
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: May 2018 – Nov 2018
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Permit: Permit prepared according to CR 3, submitted for approval and approved.
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Jul 2014 – Sep 2015
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Oct 2015 – Dec 2016
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Aug 2016 – May 2017
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Feb 2018 – Aug 2018
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Jul 2017 – May 2018
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Permit: Permit prepared according to CR 3, submitted for approval and approved.
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: October 2017 – June 2018
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Period: Apr 2018 – Nov 2018
Appointment: OHS Agent
Client: BTS
Description: Demolish inside of multi-story building and renovate into residential flats.
Complete: 100%
Permit: Permit prepared according to CR 3, submitted for approval and approved.
Task:
· Prepare a baseline risk assessment for the site according to Reg 5.1.(a)
· Prepare and submit Site Safety Specification according Reg 5.1.(b)
· Monitor the execution of OHS and Environmental activities of the main contractor and sub-contractors onsite
· Do a monthly OHS & Environmental audit of the site.
· Prepare an audit submission document to the client
· Attend one site meeting reporting on the OHS and Environmental compliance of the contractor and the sub-contractors.
· Approve the Construction Health and Safety Plan of the contractor.
Gauteng, North West and Mpumalanga
2009 to 2015:
The proposed development is located on the farm Plumari Ranch 595 JQ, Hekpoort. The proposed development consists of a Public Resort with 25 chalets and ancillary uses.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Portion 1 of the Farm Doornhoek 392 JQ, Hekpoort. The proposed development consists of a Public Resort with 25 chalets and ancillary uses.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Portions 73, 74, 75 & 76 Zwartkop 525 JQ, Muldersdrift. The proposed development is a high standard equestrian village to accommodate horses and horse-riding facilities. The overall density of the proposed development entails 1 dwelling per hectare included in an integrated lifestyle rural occupation scheme.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Plot 19 and 20 of holding 281 Pomona (x159 A.H.) Agricultural holdings, Kempton Park. The proposed activity is the recycling and refurbishing of computers as well as small scale engineering.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Plot 275 and 478 of the farm Zwavelpoort, 373JR, Pretoria. The proposed development is a Guest House and Chalets.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Portion 11 (Portion of Portion 2) of the Farm Vlakplaats 317 JT, Belfast. The proposed development is a Holiday Resort and associated uses.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Fourways Extension 56 Ervens 1 & 2 and Fourways Extension 57 Ervens 1 & 2. The proposed development is a new mixed-use Village Centre comprising national retail outlets, a gym, line shops, restaurants, banks, electricity supply, site storm water, water and sewer services, external road works upgrading, offices and a residential component supported by at grade and undercover parking.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Portion 82 of the farm Stryfontein 477-IR, Midvaal Local Municipality. The proposed development is a low density and high-quality residential development that would consist of 10 units per hectare.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Lots 127 & 128 Pomona Agricultural holdings, Kempton Park. The proposed development consists of 3 warehouses with attached offices.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located in Zandspruit Extension 21comprising 33 Residential 2 cluster units, all internal services including water and electricity reticulation, sewerage and storm water reticulation as well as all internal roads.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is a township with 10 erven, access roads and all internal services.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development consists of offices, conference center, training facility, showrooms, places of refreshments and ancillary uses.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Portion 18 of the Farm Doornhoek 392 JQ, Hekpoort. and consists of a Public Resort with 25 chalets and ancillary uses.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development is located on Plot 46 Road 6 Iron side Agric Holdings, Walkerville, Gauteng. The proposed development comprises a chicken abattoir.
An environmental Impact study were done and submitted with a successful ROD received.
The proposed development consists of a wedding venue with chapel, guest accommodation.
An environmental Impact study were done and submitted with a successful ROD received.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.